[ Chinese wardrobe network ] The overall wardrobe production process is different from the general purchase of panel furniture. First of all, the designer will have a close contact and communication with the user, understand the user's hobbies and their home style, and then measure the door and design a reasonable one. The overall wardrobe . During this period, the designer will provide a computer rendering, and after the user is satisfied, the overall wardrobe will be made from the assembly line according to the drawings.
tool:
Power tools: charging batch, impact drill, jig saw, grinding and polishing machine, angle grinder
Hand tools: hole opener, level ruler, glass glue gun, tape measure, square ruler, hammer
Step / Method:
1. Use a pad to place the floor. Start by assembling the wide side panel against the end of the wall. Place the wide side panel on the ground (maintain 700mm away from the rear wall). First, put the plate of the filled three-in-one rubber plug on the cloth, check the hole spacing and the drawing, and install the three-in-one single-link. Then the solid layer is nailed to the cork, fixed on the wide side plate, the top handle with the large handle hole facing upward, the other solid layers are facing downward, and the foot line large handle hole is facing inward (the middle solid layer is consistent with the L frame height, that is, the bottom plate to the solid layer The inner space is 960mm, and the hole is drilled on site.) Put the side panels, nail the cork, and the cork is required to connect the solid layers on both sides. Install the double connecting rod on the second cabinet. Note that the large handle on the double connecting rod can only lock half, that is, 90°. When the two solid layers are fixed to the side plates, tighten the large handles at the same time. Repeat the installation steps for the second cabinet when installing the third cabinet.
2, nail back plate. Place the assembled whole cabinet on the floor of the point cloth, and lay the side panels in the same plane. Use a slider to measure the diagonal size of the cabinet and adjust it to the same level. Start with the first backing plate from the wide measuring board. Note that if there is a solid nail in the middle, draw the core line of the solid layer with a pencil and nail it again. nail.
3. Installation of the L frame. Use the side plates of the L frame to have a parallel line on the corresponding side plates, then move the core wire of the three-in-one rubber particles up by 9mm, and draw a parallel line on the corresponding bottom plate with the top frame of the L frame. Inside the 9mm, draw the core line of three rubber particles. The hole was drilled with a 10 mm drill bit and the hole depth was 10-20 mm. Install a single pole. After the L frame is installed, nails are fixed on the back plate.
4, clean the wardrobe installation debris, left and right station one person, the wardrobe is slightly inclined backwards, forcefully lifted, moved back to the desired position, pay attention not to scratch the floor, the wall.
5. Installation of drawers, lattice racks and pants racks.
Drawer installation method: 1) The three-in-one rubber particle is inside a 1 drawer hole;
2) connecting the 2, 3 side plates to the pumping surface;
3) Connect 4 and 2, 3 side plates and plywood with intermediate solid layer ¢ 3.5*40 screws;
4) Insert the back plate 5 into the slots 2 and 3, and fix it on the rear plate 4 with small nails, and install the in-line handle (the drawer requires squareness and maintain the angle of 90°).
Install three sections of track: the track is placed against the drawer, the drawer floor is flush, and the moving mother rail fixed sub-rail screw is mounted on the sub-track vertical eye (this is adjustable). The distance between the two drawer panels to the core of the track eye plus a gap of 2mm, the data of the female rail is removed and the cross-cut line is drawn on the side panel of the cabinet with a 90° angle. The cross-section is the core eyeliner of the female rail. . The drawer panel is into the column, so the vertical cut line is drawn from the outer side of the side panel of the cabinet, the female rail is flush with the vertical tangent line, the core eye is flush with the horizontal line, and the screw is mounted on the transverse eye of the busbar (adjustable position). After the drawer is installed, the adjustable position is used for debugging, so that the drawer surface is flat and the surrounding gap is even. The rear mounting screws are on the transverse eye of the sub-track and on the vertical eye of the female rail. And so on to install the next one. In the case of full drawers, the same principle can be installed from bottom to top, and the uppermost drawer can be fixed with a 90° angle. The premise requires that the surface is leveled and the apprentice is uniform. The drawer clearance is 2mm.
Plaid rack: Install three rails as well as the three rails of the drawer, measure the distance between the side panel and the core of the rail plus 50mm gap, and draw the data to draw the cross-cut line on the side panel of the cabinet, install the female rail, debug and fix . The upper side of the side panel of the lattice frame is fixed to maintain a 50MM gap for the purpose of taking objects.
Pants rack: similar to the grid rack installation, the difference is that the side panel of the pants rack is 20mm away from the grid surface. Keeping the inner space of 20mm is also convenient for use.
6, the installation of Yitong. Move the 38mm draw cross-cut line from the ground level, the side plate is divided into the vertical cut line, and the cross pad is the core position of the first eye above the clothes pass.
7. Installation of the push-pull mirror. The three-section rail is mounted on the push-pull mirror, and the height of the push-pull mirror is generally 1700 mm above the bottom solid layer (customer can request height). The rail transverse line is drawn on the side panel at a height of 90° according to the required height. The parallel distance between the new eyes in the three-section track on the upper line is measured, and accurate data is obtained. The lower track transverse line is drawn on the side plate with a 90° angle. Install the upper and lower mother rails of the push-pull. The mother rail is 5mm away from the backboard and is equipped with a push-pull mirror.
8, finished pulling.
Because most of the foundation is moisture and grease, makeup brushes are resistant to moisture and grease, and can withstand washing, and man-made fibers work well.
Benefits of foundation brush
No dirty hands: This is the main reason why some people switch to Liquid Foundation brushes. Whether you use your fingers or a Powder Puff, the liquid foundation will inevitably get on your fingers, and there is no such annoyance with a foundation brush.
Save foundation: It does not absorb foundation by itself. When it is applied to the skin with better skin on the outer edge of the face, the remaining foundation on the foundation brush can just cover the skin thinly, and the effect of powder makeup changes from thick to thin, soft transition . If you want to save more liquid foundation, spray the brush with water (wet but not dripping) before dipping it, so that the brush will absorb less liquid foundation.
Good makeup effect: Once the foundation brush is used handily, its makeup effect is hardly critical: it is thin and even, and the skin is moisturized and shiny.
Foundation Brush Used for Premium Makeup Face Brush,Concealer Brush,Foundation Brush Round,Flawless Foundation Brush etc.
Premium Makeup Face Brush,Concealer Brush,Foundation Brush Round,Flawless Foundation Brush
Jilin Xiangqi Technology Co., Ltd , https://www.xqccosmetics.com